Waterwise Fire product certification documents.
This page lists actual certification documents currently added to the website. Certification coverage is limited to the products, models and scope shown in the corresponding certificate.
Water Flow Indicator Certificates
The current uploaded certificates apply to Waterwise water flow indicator products only. They should not be used for wet alarm valve, sprinkler, valve or other product categories unless separately covered by the relevant certificate.
FM Approved
Certificate of Compliance for vane-type waterflow alarm indicators.
- ProductVane-Type Waterflow Alarm Indicators
- ModelsVDRT & VDRS
- Prepared forWaterwise Valve Co.Ltd
- StandardFM 1042 (May 2016)
- Approval IDPR455070
- Approval Granted24 August 2021
- Date Authorized31 October 2023
UL Listed
Certificate of Compliance for waterflow indicators for fire protective signaling systems.
- Certificate No.S36367
- Report ReferenceS36367-2022-07-29
- Date2023-September-28
- Issued toWaterwise Valve Co Ltd
- StandardUL 346; CAN/ULC-S548
- Covered modelsVDRT25, VDRT32, VDRT40, VDRT50, VDRS50, VDRS65, VDRS80, VDRS100, VDRS125, VDRS150, VDRS200
Important: certification marks and claims should be matched to the actual product marking, certificate holder, model list and current certificate status before project submission or quotation.
Certification Scope Summary
| Product | Certificate | Covered Scope on This Website | Notes |
|---|---|---|---|
| Water Flow Indicator | FM Approved | VDRT & VDRS | Verify current approval availability through FM Approval Guide when needed. |
| Water Flow Indicator | UL Listed | VDRT25, VDRT32, VDRT40, VDRT50, VDRS50, VDRS65, VDRS80, VDRS100, VDRS125, VDRS150, VDRS200 | Use the official UL certificate and online directory for final project checks. |
| Other products | Not covered by these two certificates | Separate certificate confirmation required | Do not apply the water flow indicator certificates to wet alarm valve, sprinkler or valve products. |
How Certification Documents Are Used
For project quotations or customer submissions, certification documents should be checked together with model, size, marking and product data sheet.
Need certificate confirmation?
Send the model, size, destination market and project requirement.