Certifications

Certifications

Waterwise Fire product certification documents.

This page lists actual certification documents currently added to the website. Certification coverage is limited to the products, models and scope shown in the corresponding certificate.

Water Flow Indicator Certificates

The current uploaded certificates apply to Waterwise water flow indicator products only. They should not be used for wet alarm valve, sprinkler, valve or other product categories unless separately covered by the relevant certificate.

FM Approved

Certificate of Compliance for vane-type waterflow alarm indicators.

FM ApprovedWater Flow IndicatorVDRT / VDRS
  • ProductVane-Type Waterflow Alarm Indicators
  • ModelsVDRT & VDRS
  • Prepared forWaterwise Valve Co.Ltd
  • StandardFM 1042 (May 2016)
  • Approval IDPR455070
  • Approval Granted24 August 2021
  • Date Authorized31 October 2023

UL Listed

Certificate of Compliance for waterflow indicators for fire protective signaling systems.

UL ListedWater Flow IndicatorS36367
  • Certificate No.S36367
  • Report ReferenceS36367-2022-07-29
  • Date2023-September-28
  • Issued toWaterwise Valve Co Ltd
  • StandardUL 346; CAN/ULC-S548
  • Covered modelsVDRT25, VDRT32, VDRT40, VDRT50, VDRS50, VDRS65, VDRS80, VDRS100, VDRS125, VDRS150, VDRS200

Important: certification marks and claims should be matched to the actual product marking, certificate holder, model list and current certificate status before project submission or quotation.

Certification Scope Summary

ProductCertificateCovered Scope on This WebsiteNotes
Water Flow IndicatorFM ApprovedVDRT & VDRSVerify current approval availability through FM Approval Guide when needed.
Water Flow IndicatorUL ListedVDRT25, VDRT32, VDRT40, VDRT50, VDRS50, VDRS65, VDRS80, VDRS100, VDRS125, VDRS150, VDRS200Use the official UL certificate and online directory for final project checks.
Other productsNot covered by these two certificatesSeparate certificate confirmation requiredDo not apply the water flow indicator certificates to wet alarm valve, sprinkler or valve products.

How Certification Documents Are Used

For project quotations or customer submissions, certification documents should be checked together with model, size, marking and product data sheet.

1. Confirm ProductIdentify product category and required model.
2. Match CertificateCheck certificate number, holder and covered models.
3. Check Product DataConfirm size, connection, electrical data and application details.
4. Submit CarefullyUse only the matching certificate for the confirmed model.

Need certificate confirmation?

Send the model, size, destination market and project requirement.

滚动至顶部